Civil Engineering Bill Of Quantities Pdf

It gives estimated or anticipated contract sum. Variation is to be discussed in detail. This rule is acceptable when the excavation is a regular shaped hole in the ground but problems arise when it is applied to a large area of landforming or reduced level excavation.

The reason of course is that it is the definition of what rock is, that will determine to what extent it is measured. Start by pressing the button below! The Excavated Surface is the cut-and-fill line so the maximum depth is far greater in this area than over the filled section. It would be unnecessary and foolish to attempt to define the bounds of the Atlantic! Preliminaries In construction industry, preliminaries is known as the indirect cost for execution of project but these are the costs which is very much vital for the construction activities.

But whatever new skills are acquired, he must still possess a sound knowledge of building construction and the ability to take-off quantities from drawings. The total quantity and the effect on it of rounding off must be considered. The major usages are listed below. Where rates are not inserted the other priced items are deemed to carry the price of the unpriced items.

Column C is the squaring column where the result of the addition, subtraction or multiplication of the entries in the dimension column is recorded. The amount involved shall be calculated before the deduction of retentions and the aggregate total must not exceed the amount inserted in the Grand Summary.

Complications arise, however, when the excavation penetrates through more than one type of material. Our partners will collect data and use cookies for ad personalization and measurement. Turk Effective Writing Improving scientific, technical and business communication C. Building Materials in Civil Engineering. The style of measurement to deal with these events will involve a departure from the rules laid down so warranting an insertion in the Preamble.

The aim of the coding is to produce a uniformity of presentation to assist the needs of the estimator and the post-contract administration. Figures which are to be added or subtracted are bracketed together in the manner shown. This column also contains annotations giving the location of the dimensions and waste calculations which show the build up of the figures entered in the dimension column. Unfortunately this is not the case over the cut area.

It would be unwise, however, for the taker-off to abuse the power entrusted to him by this paragraph. The adoption of this system greatly increases the efficiency of the post-contract administration.

Your email address will not be published. This paragraph demonstrates this freedom. The following information is provided as a guide only and should be used with caution.

Bill of Quantities (BOQ) Building

It is also usual to include a Provisional Sum in the Grand Summary for general contingencies. Trickey Project Budgeting for Buildings D. Quite often two item descriptions share the same measurement and this is indicated by linking the descriptions with an ampersand. The dimensions should always be recorded in the order of length, width and height. The information which is of most interest to the estimator is the depth of the topsoil itself.

This is the arrangement by which lines are drawn across the Item Description column of the bill page to end the influence of a previous heading or sub-heading. The above sections should be allocated the letters A to E and the parts of the Bill contained within Section D are enumerated, e. On first consideration it may seem odd that what is primarily an engineering matter should find its place in the Preamble of the Bill of Quantities. Ideally, how to improve the communication skills pdf the quantities are computed from dimensions on the drawings.

Analyzing Uncertainty in Civil Engineering. Civil Engineering Formulas Pocket Guide. Civil Engineering Formulas.

Description column provides a brief explanation of what to be done. These descriptive features are intended to cover the broad range of activities in civil engineering but they are not exhaustive. Careful inspection of the presentation of the rates together with their values should be part of the tender appraisal process.

BoQ Archives - Basic Civil Engineering

This is obviously undesirable because the estimator requires only one item to cover all the work to be carried out under the scope of the description. Please give us also how to calculate the rate. Careful thought should be given to including either an additional preamble or enlarging the description to cover this set of circumstances. Here the term engineer means the consultant for the project. Learn how we and our ad partner Google, collect and use data.

Civil Engineering World

The example quoted refers to Class I. Hughes Construction Tendering and Estimating J. Common sense must be applied in the matter of rounding-off quantities. Leave a Reply Cancel reply.

Previously, many takers-off were incorrectly stating the maximum depth of each layer of material instead of the maximum depth of the excavation itself. Each job needs careful scrutiny and the application of sound engineering judgements to determine how the construction work should be tackled. At its simplest, it should be possible to take a descriptive feature from each division and produce an item description, e.

CIVIL ENGINEERING

The civil engineering updates

Quantity Surveying Archives - Basic Civil Engineering

He can impose his own judgement on the measurement of any item and depart from the format provided he believes it is a special case. Finally, I would particularly like to thank Len Morley for the major role he played in the preparation of the taking-off examples. The reason for these cost mentioned separately is it is very difficult to distribute these cost amongst with measured works. It is not essential that the punctuation is adhered to rigidly.

If a power station was to be constructed on the west Cornish coast it would be sufficient to state in the Preamble that the Atlantic Ocean was adjacent to the site together with tidal information. This is done by using a form of standard abbreviations which have been listed separately. The class is represented by the class letter e.

He has the freedom, of course, to enter other items which are not listed or do not have a direct counterpart in Class A. It is hoped that this book can play a part in reducing this number even further and also save time and money in expensive litigation and arbitration proceedings.

The quantities that are measured in the contract document are approximate because of the uncertainties inherent in civil engineering. Email required Address never made public.

If by following the recommendations of this section a series of unwieldy codings is produced it may be better not to apply them. Adhesives in Civil Engineering. One complication may arise if the time being expended on a Time-Related Charge looks like increasing or decreasing from that shown in the Bill of Quantities. Opportunities in Civil Engineering Careers. Rules below the double line refer only to the work contained within the same horizontal ruling.